The Hyper - v virtual machine: set up 24 virtual processors, each NUMA node 12, 15 g memory a node, a total of 30 gb of memory, system: 2008 r2sp1, database: SQL Server2008r2,
Now, in this virtual machine to run the SQL rate with me in addition a dual-core physical computing speed of 8 gb of memory, no ascension, which piece I set wrong?
Attached SQL with the Hyper - v Settings screenshot, :
